TAAFT
Free mode
100% free
Freemium
Free Trial
Deals

The Marvelous Marvin's lists

Comments

The Marvelous Marvin
Rated it
did not incorporate additional words to create the logo.
The Marvelous Marvin
meh, the clouds are to the correct scale but lacks more 2nd part of the prompted.
The Marvelous Marvin
Project Overview Based on your input, I understand that the project is a single-family, 3-bedroom, 3.5-bathroom, ranch-style earthship with solar panels and a green roof, partially built underground. The project is located in Dennison, Texas, and has a total living area of 3,566 square feet. The project will feature a 3.5-car garage, and the plumbing system will utilize recycled water from an earthly filtration system. Estimated Cost Breakdown Below is a detailed estimate of the project costs, categorized by material, labor, and overhead expenses. Please note that the estimates are based on national codes and regulations specific to the state of Texas. Site Work and Preparation Land preparation and excavation: $120,000 Underground construction (partial): $150,000 Site restoration and landscaping: $30,000 Total: $300,000 Foundation and Structural Earthship foundation: $80,000 Structural framing (steel and/or composite): $120,000 Roofing (solar panels and green roof): $150,000 Total: $350,000 Exterior Finishing Exterior walls (earthship construction): $60,000 Windows and doors: $30,000 Exterior finishes (stucco, paint, etc.): $20,000 Total: $110,000 Insulation and Drywall Insulation: $20,000 Drywall installation: $15,000 Total: $35,000 Interior Finishing Flooring (hardwood, tile, etc.): $30,000 Cabinets and countertops: $40,000 Painting and trim work: $20,000 Total: $90,000 Mechanical, Electrical, and Plumbing (MEP) MEP installation (solar panels, electrical, plumbing): $150,000 Recycled water system (earthly filtration): $80,000 Total: $230,000 Fixtures and Appliances Lighting and electrical fixtures: $20,000 Plumbing fixtures: $15,000 Appliances: $10,000 Total: $45,000 Permits and Inspections Building permits: $10,000 Inspections and testing: $5,000 Total: $15,000 Overhead and Contingency Overhead (project management, insurance, etc.): $100,000 Contingency fund (10%): $150,000 Total: $250,000 Total Estimated Project Cost The total estimated cost for this project is: $1,520,000 Assumptions The project will take approximately 1.5-4 years to complete, depending on various factors such as weather, labor availability, and material lead times. The estimates provided are based on average market prices for materials and labor in the Dennison, Texas area. The project will be built in compliance with all applicable national codes and regulations specific to the state of Texas. Please note that this is a rough estimate, and actual costs may vary depending on various factors such as changes in design, material availability, and labor costs. It is recommended to consult with architects, engineers, and contractors to get a more accurate estimate for the project.
The Marvelous Marvin
populate the forces that are needed. weigh the advantages granted or removed.
0 AIs selected
Clear selection
#
Name
Task